词语屋>英语词典>paper shop翻译和用法

paper shop

英 [ˈpeɪpə ʃɒp]

美 [ˈpeɪpər ʃɑːp]

n.  报刊经销店; 报刊亭

柯林斯词典

  • 报刊经销店;报刊亭
    Apaper shopis a shop that sells newspapers and magazines, and also things such as tobacco, sweets, and cards.

    双语例句

    • This paper is a combination of practical, shop online from the students and opportunity faced by students online shop to analyze the risks and difficulties.
      本论文主要是结合实际,从大学生网上开店面临的机遇与大学生网上开店的风险和困境来分析。
    • The paper makes the simulation experiments for the classic job shop scheduling problems. and implements the simulation system of the job shop scheduling.
      最后,本文针对经典的作业车间调度问题进行了仿真实验,并实现了Job-Shop调度模拟系统。
    • This paper analyses the characteristics and factors of manufacturing shop management comprehensive evaluation, designs an evaluation index system, establishes a fuzzy comprehensive evaluation method and develops an evaluation software.
      分析了制造业企业生产现场管理综合评价的特点和需要考虑的因素,设计了评价指标体系,建立了生产现场管理模糊综合评价方法,开发了评价软件。
    • This paper concerns with the dynamic job shop scheduling problem to minimize total weighted tardiness is studied.
      研究工件加权拖期总和最小化的动态Jobshop调度问题。
    • This paper summarizes methods of research on flow shop sequencing problem, constructs an intelligent optimization system with genetic algorithm for flow shop scheduling problem, and deals with structure and work mechanism of this system.
      综述了FlowShop调度问题的研究方法,构造了一个基于遗传算法的智能化调度系统,给出了系统的结构组成及工作机制。
    • In this paper, the shop floor scheduling algorithm is studied.
      本文在传统的遗传算法的基础上,对车间调度算法进行了深入的研究。
    • Buy up the whole of the paper shop this morning?
      今天早晨是不是打算把店里的报纸都买走?
    • Satisfaction and trust has a significant impact on customer loyalty and trust has the greatest impact on customer loyalty. Finally, from the reverse logistics services, this paper makes some sugges-tions of B2C Shop about how to improve customer loyalty.
      最后,从逆向物流服务方面,对B2C网店如何提高顾客忠诚提出了几点建议。
    • This paper studies fuzzy flow shop scheduling problem which involves both fuzzy processing time and fuzzy due date. Fuzzy processing time is denoted by a triangular fuzzy number and fuzzy due date is denoted by a trapezoid one.
      对同时考虑模糊加工时间和模糊交货期的模糊流水车间调度问题进行了研究,模糊加工时间用三角模糊数来表示,模糊交货期用梯形模糊数来表示。
    • This paper first study three stages flexible flow shop scheduling problems: with m_1 identical parallel machines in stage one, a batch processor in stage two, and m_2 identical parallel machines in stage three.
      首次研究了3阶段柔性流水作业问题,其中阶段1由m1台同型机组成,阶段2为一台批处理机,而阶段3由m2台同型机组成。